A four-port PoE passthrough switch fed from an 802.3at port will power one camera. Not four. That sentence has saved me more site visits than any other piece of PoE arithmetic, because the box in your hand looks like it should do four: four RJ45s, four PoE LEDs, a label that says 30 W per port. The label is true per port. It says nothing about the total.
I had one on a loading dock ceiling in Bao'an last month. Five ports, one PoE in, four PoE out, mounted where the tray turns a corner. Two cameras lit and stable, two ports that had never come up. By the time I arrived the installer had already replaced both cameras, both patch cords and the box itself, and the second box behaved identically. Then I unplugged one of the working cameras and a dead port came alive about four seconds later. That is not a fault. That is a budget being re-drawn.
The uplink sees one device, not four
Look at the switch end first. Whatever sits behind that uplink, the PoE switch sees a single powered device: one 25 kΩ signature, one class, one watt figure. Fed from an 802.3at port, that figure is 25.5 W at the PD, and the port reserves 30 W against the switch's total. Permanently. Whether the four downstream ports carry 3 W sensors or nothing.
Three consequences, and I end up explaining all of them on most calls.
The budget. A 24-port switch with 370 W of PoE budget now gives you 23 ports plus one 30 W reservation feeding an unknown number of devices. If the schedule says 24 cameras on 24 ports, it is wrong, and it will be wrong in the direction that costs you a port at the end. I wrote about the port-count side of this separately; the reservation side is the same trap in a different shape.
The telemetry. The management page reports one port at 21 W. It cannot tell you which camera fell off, because it never knew there were cameras. Four devices, one row.
The reboot. Bouncing that port reboots four devices at once. Camera boot is 40–60 s, so you lose a minute or two of four recording channels rather than a minute of one. If a watchdog behind the box pings one address, it cycles all four to fix one.
Twenty watts downstream is not five watts a port
The datasheet number that matters is "PoE power budget." On my bench unit it reads 20 W when the input is 802.3at. Twenty divided by four is five, and five watts is plenty for a door sensor. That is how the mistake gets made. It is not how the box allocates.
Nearly all of these units reserve by class, the way a real switch does. Class 3 holds 15.4 W whether the camera draws 6 W or 12.9 W. So 20 W downstream does not give you four 5 W ports. It gives you one 15.4 W port, one 4 W port, and two that never light.
| Feed at the PD | Published downstream budget | What that actually reserves |
|---|---|---|
| 802.3af, 12.95 W | 10 W | One class 2 at 7.0 W, or two class 1. Not one class 3. |
| 802.3at, 25.5 W | 20 W, sometimes 25 W | One class 3 at 15.4 W plus one class 1. A second class 3 needs 30.8 W. |
| 802.3bt Type 3, 51 W | 40–45 W | Two class 3 ports, occasionally three. |
| 802.3bt Type 4, 71.3 W | 60–65 W | Three or four class 3 ports. |
That table also explains the port that never comes up. Someone buys four class 4 cameras, thirty watts each on the label. The box is fed from 802.3at and has 20 W downstream. The camera asks for class 4, the box cannot reserve 30 W, the port declines, the LED stays dark, and nothing in an unmanaged box logs "insufficient budget." The installer concludes the camera is dead, which is exactly what happened on that loading dock.
The cheap units use a different model: they measure and hand out what is drawn. Four cameras pulling 5 W each fit in 20 W exactly, and the job passes. Then November arrives, the heaters and the IR illuminators switch on, each camera goes to 8 W, the total crosses 32 W, and the box sheds a port — the last one detected, which is whichever camera booted last. I watched a car park lose its entrance camera every evening at 17:40 for a week for exactly that reason.
The overhead hides between 3 and 30 watts
Here is the part that made me stop trusting the category's numbers. Two boxes, same distributor catalog, same shape, four downstream ports each:
One lists 65 W of downstream budget from a 95 W input. The other lists 85 W from a 90 W input. From 802.3at, the first promises 25 W downstream and the second 20 W. Same feed, same port count, five watts of disagreement.
Twenty-five out of 25.5 is 98%. That is not a power supply, that is a rounding error with a heatsink. And 85 W out of a 90 W input is not 802.3bt at all, because Type 4 puts a maximum of 71.3 W into a PD. Those figures only exist in a proprietary mode where both ends of the cable are the same vendor. Against a normal 802.3bt switch, the number on the box is fiction.
What the overhead really is: the switch chip, the PHYs, the PoE controller and its sense resistors. On my bench a fanless five-port gigabit unit draws 3.8 W from a 54 V supply with nothing plugged in, and 5.1 W with four ports linked at 1 G. So 3–6 W is the honest range. A 30 W gap between two datasheets is not a design choice, it is one of them quoting the wrong node.
You can settle it in ten minutes. Bench supply at 54 V into the PoE-in port, ammeter in series, nothing downstream. Read the current and multiply. Then link one downstream port and read again. Everything downstream is input minus overhead, and no datasheet argues with your own meter.
Two hundred metres is a class 1 promise
"Doubles the distance to 200 m" is on every one of these boxes. It is true, and it is a promise made at class 1, because 200 m means two 100 m segments and the far device pays for both.
The standard gives a channel 12.5 Ω of loop resistance to work with. A 100 m run of 24 AWG eats roughly 9.4 Ω of that before patch cords and warm copper. At 0.55 A — a class 4 load near full — that is 6.9 V per segment, plus about 1 V across the box's own pass-through. Two segments, and 15.8 V is gone from a 54 V supply.
| Load at the far end | Current | Per segment | One box | Two boxes |
|---|---|---|---|---|
| 4 W sensor | 0.09 A | 2.1 V | 52 V | 50 V |
| 7 W access point | 0.15 A | 2.9 V | 51 V | 48 V |
| 12.95 W camera | 0.28 A | 4.5 V | 50 V | 45 V |
| 25.5 W PTZ | 0.55 A | 7.9 V | 46 V | 38 V |
802.3at and 802.3bt devices must keep working down to 42.5 V at their input. 802.3af devices go down to 36 V. The last row lands at 38 V after two boxes, which a bt PD will not accept, and the far port simply never powers. The 12.95 W row sits at 45 V, which works, and leaves three volts of margin for a long patch cord, a warm tray and a camera that pulls more than its label.
That margin is where the interesting failures live. Copper gains about 0.393% resistance per °C, so a tray at 50 °C is 11% above the bench figure and the twelve-watt row drops to 44 V. Now add IR: the same camera draws 18 W with the illuminator on, current goes to 0.39 A, and two boxes put the far end at 42.2 V — under the floor. It browns out, reboots, the illuminator goes off, the voltage recovers, the camera boots, and the cycle starts again every 90 seconds. Measure in daylight and you will never see it.
Two detections in series, and the reboot trap
Every hop re-runs the handshake. The upstream port measures 25 kΩ at the box; the box then measures 25 kΩ at each of its own ports, 2.7 to 10.1 V, around 108 µA. The handshake itself does not change with distance. What changes is who is doing the measuring.
Marginal devices survive one detection and fail two. I have a camera on the shelf with a leaky input capacitor that sits near the edge of the 19–26.5 kΩ window. Directly on a switch port it detects every time. Behind a box, with 100 m of extra copper and a cheaper sense circuit, it fails perhaps one attempt in three, and the port stays dark. Nothing is broken. The signature is just being read by a second, worse meter.
And the reboot trap. Cheap boxes hang. When one does, your only reset is the upstream port, and if you are managing the box through that same cable you are switching off the lights in the room you are standing in. I have done this twice, both times at night, both times after telling someone on the phone it would only take a second.
Where a passthrough box earns its place
I am not against them. I installed one last week above a mezzanine to feed three sensors and a door intercom at 130 m, because the alternative was a 40 m conduit run to a socket that did not exist. The condition is narrow: load inside the budget, no class 4 device, and a real reason not to run AC.
| Option | Downstream watts | Reach | Fits |
|---|---|---|---|
| 4/8-port passthrough switch | 20 W on 802.3at, 60 W on bt | 200 m | Cluster of low-power devices |
| Inline two-port extender | Input minus 2 W | 200 m per hop | One camera, one cable already in the wall |
| Media converter plus local supply | Full, from the local supply | Kilometres | Building to building, where a socket exists |
| Small AC switch at the far end | Full | 100 m | Four PoE+ cameras, if you can get power there |
Seven numbers to settle before you buy
- Downstream budget at your feed standard, not at the maximum input the box lists. An 802.3at feed is the 20 W row, not the 65 W headline.
- Own consumption, measured at idle and with one port linked. If you cannot measure, assume 5 W.
- Budget minus own consumption, divided by 15.4. That integer is your class 3 port count. Everything else is arithmetic you do not control.
- The highest class among the downstream devices. One class 4 device means you need bt at both ends, and a bt feed costs 71.3 W of upstream budget.
- Worst-case current, not nameplate: use P ÷ 45, then subtract 54 − n × (I × 12.5 + 1), where n is the number of segments.
- The hot-day figure. Multiply the segment resistance by 1.11 at 50 °C and run step 5 again. If the answer is under 43 V, you have a design that fails in August.
- What the box does after a power cut. Some remember port state, some re-detect everything and stagger over 30 s, a few come up with every port off. Ask before it goes on a ceiling.
Questions I get
Can I chain three of them?
At class 1 and 2 loads, yes — I have seen four in a row on a fence line running 4 W radios, and it worked for years. At class 3 and above, no. The second box puts the far device at 45 V; the third puts it under 42.5 V. Three hops with real loads is not extending PoE, it is distributing mains power badly.
Does the box need an IP address?
Most of them do not have one. No per-port power reading, no way to disable a port, no log. That absence is the real cost, not the price. A box you cannot see is a box you will blame the cameras for.
Will a 90 W injector upstream fix the budget?
Only if the box's PD port is rated for it and speaks the same mode. A Type 4 injector in front of an 802.3at-only box negotiates down to 25.5 W, and you are back at 20 W downstream with a more expensive injector. And remember that 90 W at the PSE is 71.3 W at the box at best.
Is the PoE-in port usable as an ordinary uplink?
On most units, yes, when it is not being fed. But check the link speed first: on some, the PD front end shares the data magnetics and 1 G negotiation gets unreliable. And if you plug the upstream into a downstream port by mistake, none of these boxes run STP, so you have built a loop.
Why does the far camera work in the morning and drop after dark?
IR. A 12 W camera goes to 18 W when the illuminator cuts in, current rises by half, and the two segments that were costing 9 V now cost 12 V. Measure at the far jack at 10 a.m. and again at 8 p.m. If the two readings differ by more than 3 V, the run is already at its edge and you are one warm day from a reboot loop.
None of this is exotic. It is the same subtraction the standard has been doing since 2003, applied one more time at every box you insert. What changes is that a passthrough switch hides the arithmetic inside a device that reports nothing, so the mistake shows up as a dead camera rather than a red number on a budget page.
The figure I write on the drawing now is not the port count. It is the voltage that arrives at the last jack at the worst hour of the worst day, illuminators on. Above 43 V, the box is fine. Below it, no amount of ports will help.
If you are running four cameras off one of these without trouble, send me the feed standard and the two segment lengths. That combination is rarer than the catalogues suggest.